Monday, July 3, 2006

Metropolitan Branch Fail

Despite the good news out of Montgomery County there is still much about the future of the Metropolitan Branch Trail (MBT) to worry about. Not that it won't be built, I believe it will; but that it will be less than what it could be, should be or was promised to be. I'm talking specifically about the New York Avenue to Franklin Street section - arguable the signature section of the trail.

Mbtconcept As originally designed this section - built on old railroad right of way that consisted of sidelings and the Eckington rail yard - was to be a park-like facility with a trail running down the middle. A picture of what it would look like even graced the cover of the concept plan (at right). It shows a trail passing directly through a green space with waysides and an open air cafe opening up to the trail and park. This is not what will be built.

Despite the stated objective of "providing a visually attractive setting for the trail in the open space between CSX tracks and current development," what is instead planned is a trail shoehorned in between office buildings and sprawling parking lots. Due to a Z-shaped turn, it won't even provide a direct route as originally designed.

Let's move south to north starting from the NY Ave metro station trail. A building is to be built on the triangle between NY Ave, Florida Ave and the trail. When I talked with DDOT they had no idea what this building would look like. Will it open up to the trail? Will there be a green buffer? Will it just be a big brick wall? They didn't know. Why isn't building a structure that integrates the trail a requirement?

Next the trail will pass between the PEPCO facility and the tracks, through the "Capital Commerce Center." As originally planned there would be a connection here between Harry Thomas Way and the trail (see below, right hand side), but not any more. Mbtnya Then the trail was to bend to the west with a connection to R St. But now the trail instead follows the connection to R St and then turns more than 90 degrees to continue north on the west side of the property (see this for a map of what it will look like). This requires a user to make two greater than 90 degree turns (the Z-turn I mentioned). Besides being dangerous it's slow. This was to be a "bicycle beltway." I've never seen a 95 degree turn on the beltway. And what will go where the trail was supposed to? A parking lot (not sure how cars will get to it, but I suspect they would cross the trail).

The plan calls for waysides, green space, art gardens and performance space. It talks about place making. But I fear this project will become a 12 foot wide strip of asphalt surrounded by whatever developers decide will make the most money. I'm not anti-growth, but it's too bad that an opportunity to create a green space in the center of the city is being squandered for the growth machine.